PM Surya Ghar — Registered Solar Partner

PM Surya Ghar Muft Bijli Yojana

The Government of India refunds up to ₹78,000 on a 3 kW rooftop solar system. Here’s exactly how the money breaks down — and how to claim it.

Subsidy Ladder

How The Subsidy Stacks Up By System Size

Subsidy is calculated per kW installed and capped at 3 kW for residential rooftop systems.

₹30K
1st kW installed
₹60K
Cumulative at 2 kW
₹78K
Cumulative at 3 kW (max)

Figures reflect the central PM Surya Ghar scheme as of the latest guidelines; state-level top-ups may apply in some regions.

Eligibility

Who Qualifies

  • Own rooftop with clear title / no-objection from the housing society
  • Existing (or new) domestic electricity connection in the applicant's name
  • No prior solar subsidy claimed on the same connection
  • Rooftop area free of major shading for at least 4–5 sunlight hours

Estimate Your Subsidy

Enter your average monthly electricity bill for a rough estimate — we’ll confirm exact figures during your free site survey.

Recommended
Est. subsidy
Est. annual saving
Process

From Application To Payout — Five Steps

01

Register & Apply

Submit your electricity consumer number on the national PM Surya Ghar portal — we do this for you.

02

Free Site Survey

Our engineers assess your rooftop, shading and sanctioned load to right-size the system.

03

Installation

Certified installers complete wiring, mounting and safety checks, typically within 5–7 days.

04

Net-Metering

We coordinate with your DISCOM to install the net-meter and get final approval.

05

Subsidy Disbursed

Once commissioned, the subsidy is credited directly to your bank account by the government.

FAQ

Common Questions About The Subsidy

How much subsidy can I get under PM Surya Ghar?

₹30,000 for a 1 kW system, ₹60,000 for 2 kW, and up to ₹78,000 for a 3 kW system — the maximum subsidy cap under the scheme.

Who handles the subsidy paperwork and portal application?

TVISI Electric / SOLARGY handles the full process for you: registering your consumer number on the national PM Surya Ghar portal, the free site survey, installation, coordinating net-metering with your DISCOM, and following up until the subsidy is credited to your bank account.

How long does installation take?

Installation is typically completed within 5–7 days after the free site survey, followed by DISCOM net-metering approval.

What is the typical payback period for a rooftop solar system?

Most residential systems pay back their cost in roughly 3–5 years through electricity bill savings, after accounting for the PM Surya Ghar subsidy.

What are the eligibility requirements for the subsidy?

You need a valid electricity consumer account in your name and a rooftop area free of major shading for at least 4–5 sunlight hours a day.

Which areas does SOLARGY / TVISI Electric serve?

We are based in Gurugram, Haryana and serve Gurugram and the wider NCR region.

Let Us File Your Subsidy Application

We handle the portal, paperwork and DISCOM follow-up end to end.

Start My Application